Water and Gas meters (installation of water meter to be organised by Owner prior to KIBA starting)Organisation of any fencing credits from neighbouring lotsAny demolition, including any removal of existing fences and trees, underground servicesScreens and window coverings (if required to comply with council requirement)Landscaping and driveways including kerb/footpath cutoutsRetaining walls and fencingBuilding relaxations and town planningAcoustic, bushfire, coastal fallout requirements, traffic control, flood height requirements, slope stability reports, erosion reports or any other non-standard requirementsWater TankClotheslineDishwasher (standard opening will be left with connection point)3 Phase Power, overhead power (including extra cost of Pole hire) and Generator costs if power connection is delayedRock excavation/removal (for example for footings, fencing, retaining walls etc)Feature walls, feature tiles, shower nichesPendant lights and assemblyHSTP Systems & plumbing application associated with HSTP (if no sewer available)Identification survey (usually required in older existing areas). If an identification Survey is required, the construction cannot proceed until the survey is completed so that the house can be accurately positioned.